Old Stagecoach Road/Center Street

 
 
  • $41.2 Million

  • 2.2 Miles

  • This project will improve Old Stagecoach Road from RM 150 to Center Street. It will also improve Center Street from Old Stagecoach Road to Veterans Drive. Both proposed roads will be 3- to 4-lane arterials. There are two proposed roundabouts located at Old Stagecoach and Six Creeks and at Old Stagecoach and Center Street (off-system).

  • Design in progress (preliminary design phase).

    To see a phased schedule for the completion of this project click below.